Skip to content
Affordable All-ProRoofing

Draper, UT

Roofers in Draper, UT

Good roofers in Draper are booked out. That is a decent proxy for quality. It also means the crew that can start tomorrow, right after a storm, at a discount, for cash, is worth a hard second look.

Utah DOPL #13872603-5509 · Licensed & insured · Locally owned since 2011 · Free written estimates

Free Estimate in Draper

We will call you back to schedule. No obligation.

Or call 385-534-3402. By submitting you agree we may contact you about your request. We do not sell your information.

Licensed & insured

Utah DOPL

Free inspections

Photo documented

Since 2011

Locally owned

Written warranty

On every replacement

How to Choose a Roofing Contractor in Draper

Roofing has a low barrier to entry and a long feedback loop — a bad install can look perfect for four years. These are the checks that actually separate companies, in rough order of how much they tell you.

  1. 1

    Verify the Utah license, then verify the insurance separately

    Ask for the DOPL license number and look it up yourself. Then ask for a certificate of insurance sent directly from the insurance agent, not a PDF forwarded by the contractor. Both general liability and workers’ compensation. If a worker is hurt on an uninsured crew, the exposure can land on the homeowner.

  2. 2

    Require the scope in writing, itemized

    Underlayment type, ice-and-water shield coverage, whether flashing is new or reused, ventilation, the per-sheet decking rate, permit, and cleanup. A one-line quote for "new roof, $14,500" is not an estimate.

  3. 3

    Confirm a permit is being pulled

    Most municipalities in Draper require a permit for a full replacement. Skipping it saves the contractor a few hundred dollars and can cost you at resale.

  4. 4

    Ask who is physically doing the work

    Employed crew or subcontracted? Neither answer is disqualifying, but a company that will not answer plainly is telling you something.

  5. 5

    Ask for the two warranties by name

    The manufacturer warranty covers the shingles. The workmanship warranty covers the installation, and it is only as good as the company behind it. Ask how long they have been operating locally.

  6. 6

    Never pay in full up front

    A deposit is normal. Paying the full amount before materials are on site is not, and it removes every bit of leverage you have.

What Roofs Actually Cost in Draper

Local figureTypical for Draper
Typical roof size24 – 40 squares (Draper average)
Typical full replacement, architectural shingle$14,000 – $32,000
Housing stocklarger two-story and custom homes, many with complex rooflines, multiple dormers, and steep pitches
ZIP codes served84020
Ranges reflect typical installed pricing in the Salt Lake Valley for 2026, including tear-off, disposal, and permit. Your number depends on roof size, pitch, layers, decking condition, and complexity. We put the real figure in writing after we have been on the roof.

The most complex rooflines we work on. Multiple intersecting gables, dormers, and long valleys mean far more flashing and labor per square than the size alone suggests.

That range assumes a complete tear-off, synthetic underlayment, ice-and-water shield at the eaves and valleys, new flashing, and ridge ventilation. A quote materially below it is usually missing one of those, not finding a cheaper shingle.

What Actually Happens on the Job

Here is the full sequence for a typical Draper project, so nothing on the day is a surprise.

  1. 1

    Free inspection

    We get on the roof, photograph what we find, and check the attic where access allows. Ventilation and decking condition get looked at, not assumed.

  2. 2

    Written estimate

    You get an itemized scope, a material selection, a price, and a plain-language explanation of anything we flagged. No same-day-signature discount, ever.

  3. 3

    Scheduling and materials

    We book the date, order material, and pull the permit. Material is usually delivered the day before or the morning of.

  4. 4

    Protection and tear-off

    Landscaping, AC units, and driveways get covered. The old roof comes off down to the deck. On most homes this is the loudest three hours of the project.

  5. 5

    Deck inspection

    With the roof off, we walk every square foot of decking. Soft or rotted sheets are replaced and counted, and you see the count before we cover it up.

  6. 6

    Dry-in

    Ice-and-water shield at eaves, valleys, and penetrations. Synthetic underlayment across the field. The house is weather-tight from this point forward.

  7. 7

    Flashing and ventilation

    New flashing at walls, chimneys, and penetrations. Ridge vent cut and installed, intake ventilation verified.

  8. 8

    Shingles, ridge, and cleanup

    Field shingles, then hip and ridge cap. Magnet sweep of the yard and driveway, debris hauled off the same day.

  9. 9

    Final walkthrough

    We walk it with you, hand over the warranty paperwork, and the final payment is due after you have seen the finished job — not before.

What We Handle in Draper

  • Full tear-off and replacement in asphalt, metal, and tile
  • Storm, wind, and hail damage assessment, with insurance claim documentation
  • Flashing, valley, chimney, and skylight work
  • Ridge and intake ventilation correction
  • Attic ice dam mitigation on bench and canyon-mouth homes
  • Low-slope and flat sections in TPO, EPDM, and modified bitumen
  • Detached garage, shop, and outbuilding roofs
  • Gutter and fascia repair as part of a roof project
  • Roof certifications for real estate transactions
  • Leak diagnosis and repair — including the leaks two other companies could not find

Roofing in Draper: What's Different Here

Draper has the most complicated rooflines we work on. Multiple intersecting gables, dormers, and long valleys mean more linear feet of flashing and more places for water to find a way in — and it means a square-foot price quoted over the phone is close to meaningless here.

SunCrest and Traverse Ridge sit high enough to see materially more snow and much stronger wind than the valley floor, and wind uplift ratings genuinely matter on those homes.

Housing here is larger two-story and custom homes, many with complex rooflines, multiple dormers, and steep pitches. We work throughout SunCrest, Corner Canyon, Draper Heights, Steeplechase, and the rest of Draper — including everything near Corner Canyon.

ZIP codes we serve in Draper: 84020.

Why Homeowners in Draper Call Us Back

We have been roofing the Salt Lake Valley since 2011. The thing customers mention most is not the roof — it is that we told them what we actually found, including the times that meant not selling them anything.

  • Licensed and insured in the state of Utah
  • Free, no-pressure roof inspections and written estimates
  • Manufacturer-certified installers on every crew
  • Workmanship warranty on every full replacement
  • We handle the insurance paperwork on storm claims
  • Financing available with approved credit

If your roof has years left, we will say so and put it in the report. That costs us a sale today and it is the reason we are still here.

Neighborhoods We Cover in Draper

We work throughout Draper — SunCrest, Corner Canyon, Draper Heights, Steeplechase, the Traverse Ridge area, the 12300 South corridor — and everything around Corner Canyon, the Point of the Mountain, Traverse Ridge. Draper has roughly 50,000 residents and sits in Salt Lake County.

SunCrest and Traverse Ridge sit high enough to see materially more snow and much stronger wind than the valley floor, and wind uplift ratings genuinely matter on those homes.

Roofers FAQs — Draper

Is the estimate really free?

Yes, and it is written and itemized. There is no charge, no obligation, and no expiring discount. If your roof does not need work, we will tell you that and leave.

How do I know a roofing contractor is legitimate?

Look up the Utah DOPL license number yourself, get the certificate of insurance directly from their agent, confirm they are pulling a permit, and require an itemized written scope. Any contractor who resists all four is telling you something useful.

Do you use your own crews or subcontractors?

We use crews we know and work with consistently, and the same project manager is on your job from the estimate through the final walkthrough. You will always have one person to call.

How long does a roof replacement take?

Most homes in Draper are one to two days on site for asphalt shingle. Metal runs three to six days, and a tile lift-and-relay three to five. Weather can move dates, and we would rather reschedule than dry-in a roof badly.

Will my landscaping and driveway be protected?

Yes. Plants, AC units, windows, and driveways get covered before tear-off begins, and we run a magnet sweep across the yard and drive at the end of every day, not just at the end of the job.

Do you actually serve Draper?

Yes. Affordable All-Pro Roofing covers the entire Salt Lake Valley, including Draper. We are based in West Jordan and most of our work is within a twenty-minute drive of the office.

Free roofer inspection in Draper

Photo documented, written, and yours to keep. If your roof does not need work, we will tell you that — and we will put the remaining life in writing.

More Roofing Help for Draper

Roofers by ZIP Code

Roofers in Nearby Cities

Free Estimate in Draper

No pressure, no obligation. We will call you back to schedule.

Or call 385-534-3402. By submitting you agree we may contact you about your request. We do not sell your information.

385-534-3402Free Estimate